| Requirement To start with,
we envisage a network comprising 3 trains- each
transporting, say, 60 passengers. Visually, the
monorail should look futuristic,smart and original
but it should also incorporate the necessary
technology to fit the climate: for example, windows
that guarantee maximum view of the environnment, but
also ensure minimum heat attraction.
General
information
MM ( Manama
Monorail
) is the vital part of the Manama Trading
Orbit. It would connect all the trade bridges with
each other. A trip along the Corniche would provide
an entirely different overhead perspective to the
visitors. The panoramic view of the land and sea
would provide an exciting visual spectacle to the
tourists. All the projects alongside will have
tremendous exposure, which would boost their
individual image and bring rapid and intensive
development to the area.

ROUTE : The Monorail would run
alongside the King Faisal Corniche from the
Exhibition Centre to the Museum. The
"one-way" option will be 7 to 9 km, and the
"loop" option will be 14 to 18 km including
the Diplomatic Area and connecting the Exhibition
Road end through the GOSI Shopping Mall. The
"loop" option can accommodate additional
trains depending on the traffic and frequency
requirement.
WHY
THE MONORAIL?
1. It is the most
internationally acclaimed and attractive transport
system. With its height above ground, it can run
alongside the Corniche; it would also provide
interesting views to the passengers.
2. The MM does not
encroach upon land, nor require protective, unsightly
fencing and it does not block the sea-view.
3. As well as being
very comfortable and environment friendly, it is free
from noise and polution. Moreover it does not
interfere with the existing traffic and has a zero
accident record.
4. With its stylish
and futuristic design, it will become a symbol of the
nations modern outlook.
|